The Bold Voice of J&K
Browsing Tag

Power shut down

Power shut down in Jammu

STATE TIMES NEWS JAMMU: To carry out shifting of 1X6.3 MVA, 33/11 KV R./Stn. Greater Kailash from 132/33 KV Grid Station Gangyal to Grid Station Bari-Brahmana-1, the power supply to Birpur Industry, Gangyal Industry, Seora, Babliana,…
Read More...

Power shut down

STATE TIMES NEWS JAMMU: To carry out various leftover works of 33 KV Canal-Parladpur line damaged during the flash floods, the power supply to Surechak, Phallian, Mandal, Makwal, Ganeshuchak and its adjoining areas fed from 132/33 KV…
Read More...

Power shut down

STATE TIMES NEWS JAMMU: To carry out various leftover works of 33 KV Canal–Parladpur line damaged during the flash floods, the power supply to Surechak, Phallian, Mandal, Makwal, Ganeshuchak and its adjoining areas fed from 132/33 KV…
Read More...

Power shut down

JAMMU: To carry out the work of relay testing (primary and secondary) and preventive maintenance of allied equipment at 50 MVA, 132/33 KV Grid Station Mahanpur, the shutdown of 1 x 50 MVA, 132/33 KV Grid Station Mahanpur on 26th October,…
Read More...

Power shut down

JAMMU: To carry out the erection of 13 mtr steel tubular poles under 33 KV G-2, G-3, G-6 and G-7 lines and other allied line works and LT line of auxiliary transformer in Gladni, the power supply to Channi Himmat, Sainik Colony, Transport…
Read More...

Power shut down

JAMMU: The power supply to Chenani, Kud, Mantalal, Samroli, Latti, Dudu, Sudhmahadev would be affected on 19th and 20th September, from 10:00 AM to 3:00 PM in view of the shutdown of 33 KV Chenani line for shifting of 33 KV line near the…
Read More...
WP Twitter Auto Publish Powered By : XYZScripts.com