The Bold Voice of J&K

Portion of under-construction highway tunnel in Ramban caves in

141

STATE TIMES NEWS

Banihal/Jammu: A portion of an under-construction tunnel along the Jammu-Srinagar national highway caved-in in Ramban district but no loss of life or injury has been reported, officials said Sunday.
Workers were not present at the site when the overhead soil lost its grip and came down inside the 400-metre under-construction tunnel at Maroogh late on Saturday night, they said.
According to the officials, such happenings are routine during tunnel construction work and a team of experts inspected the spot. The caved-in portion is about 100 metres inside the tunnel from the Ramban side, the officials said. A police official said a detailed report, also covering the safety and lighting arrangements, is being prepared.

WP Twitter Auto Publish Powered By : XYZScripts.com