TRAFFIC POLICE HEADQUARTERS, J&K, JAMMU/SRINAGAR
- From 02-02-2024, 1700 hrs. to 03-02-2024, 1700 hrs., there was slow movement observed on NH-44 due to breakdown of 04 HMVs and poor surface condition of road at Dalwas and single lane traffic at Cafeteria-Mehad, Magerkote, Nachlana, Kishtwari Pather and Hingani between Nashri and NAVYUG Tunnel.
- Passengers/LMVs operators are advised to prefer journey on Jammu-Srinagar NHW during day time. Please avoid journey during night hours as apprehension of shooting stones between Ramban and Banihal.
- HMVs Operators/Owners are requested to desist from overloading and carry sufficient fuel during journey on Jammu-Srinagar NHW. It is further requested that vehicle owners must double check the fitness of their vehicles and carry sufficient fuel before undertaking journey on Jammu-Srinagar NHW.
- HMVs with only 06 and 10 tyres shall be allowed to ply through Dhar road.
TRAFFIC PLAN & ADVISORY FOR 04-02-2024:-
Jammu-Srinagar National Highway (NH-44) is single lane/slippery at a number of places between Nashri and NAVYUG Tunnel. Decision regarding the vehicular movement on NH-44 shall be taken tomorrow morning after assessing the road condition. SSG ROAD
Srinagar-Sonamarg-Gumri road is still blocked due to snow accumulation.
Mughal Road:-
Mughal road is still blocked due to snow accumulation
ADVISORY:-
People are advised to undertake journey on NH-44 only after confirming status of the road from Traffic control units as under:-
• Jammu (0191-2459048, 0191- 2740550, 9419147732, 103)
• Srinagar (0194-2450022, 2485396, 18001807091, 103)
• Ramban (9419993745, 1800-180-7043)
• Udhampur (8491928625)
• PCR Kishtwar (9906154100) for status of Sinthan Road.