JAMMU: To carry out work of PCC pole erection and installation of HT/LT cable by M/S. IRCON under R-APDRP scheme, the power supply to Paloura Soap factor and its adjoining areas shall remain affected on 20th to 22nd October from 9:00 AM to 2:00 PM. Similarly, the power supply to BSF Paloura, Subash Nagar, Priya Darshani Lane, Bakshi Enclave and adjoining areas shall remain affected on 20th October from 8:00 to 10:00 AM. Meanwhile, the power supply to Upper Roop Nagar, Buta Nagar, Shiva Enclave, Muthi PHE and Top Paloura areas shall remain affected on 20th and 22nd October from 10:00 AM to 1:00 PM. Similarly, the power supply to Lower Roop Nagar, Laxmi Nagar, Upper Muthi, Lower Muthi, Roop Nagar, Dream City, Barnai, Neetar Kothian, Patoli, Paloura, BSF Camp, Army Brigade, PHE Muthi, Doordarshan and adjoining areas shall remain affected on 21st October from 10:00 to 11:30 AM.