The Bold Voice of J&K

Power shutdown in Jammu

0 66

 STATE TIMES NEWS
JAMMU: To carry out the R-APDRP works, the power supply to Muthi, Keran, Barnai, Lower Barnai, Gurha Brahmana and its adjoining areas being fed from MU-4 LT Network feeder shall remain affected from January 8 to 20, 2017 from 9 am to 5 pm (Power block on alternate DTs).
Likewise, the power supply to Udheywala, Akalpur, Chohana Chak, Sangrampur, Lower Barnai and its adjoining areas fed from UD-3 LT Network feeder shall remain affected from January 8 to January 20, 2017 from 9 am to 5 pm (Power block on alternate DTs).

Leave a comment
WP Twitter Auto Publish Powered By : XYZScripts.com